OPERATOR'S MANUAL
Table Of Contents
- OPS - Excavator K008-3 (RA028-8222-2)
- List of Abbreviations
- General Symbols
- Foreword
- Safety First
- Contents Page
- Safe Operation
- Dealer Service
- Technical Data
- Description of Machine Parts
- Instrument Panel and Control Elements
- Before Start
- Operation of the Engine
- Excavator Operation
- Control Observations During Operation
- Running In of the New Excavator
- Starting
- Controls for Attachments
- Operation of the Boom
- Operation of the Arm
- Operation of Bucket
- Swivel (Unit Swing) Operation
- Boom Swing Operation
- Boom Swing Pedal
- Operation of Track Width Change and Dozer
- Driving
- Turns
- Up and Downhill Travelling
- Parking on a Slope
- Drive Speed Pedal
- Service Port Operation
- Important Information on Excavator Operation
- Operating Foldable ROPS
- Transporting the Excavator on a Truck
- Lifting of the Excavator
- Maintenance
- Regular Checks and Maintenance Work
- Other Adjustments and Replacements
- Troubleshooting
- Operation in Cold Weather Conditions
- Long Storage
- Recommended Oils
- Main Dimensions
- Lifting Capacity
20 EXCAVATOR OPERATION
BOOM SWING PEDAL
To avoid personal injury or death:
A Always keep your toes within the
edge of foot step; otherwise there is a
possibility that your toes will be
caught between swing frame and
boom or boom cylinder.
To avoid personal injury:
A When boom swing operation is not in
use, fold the boom swing pedal
forward to fix the pedal from
unexpected moves.
OPERATION OF TRACK WIDTH
CHANGE AND DOZER
To avoid personal injury:
A Do not operate in narrow track width
700mm, there is a risk of the
excavator tipping over, always
operate in standard track width
860mm, except when passing through
narrow spaces on a even ground.
A For changing the track width or using
the dozer, set the track width change/
dozer select lever fully.
If not, the excavator may
unintentionally move.
BOperation of the Track Width
1. Set the track width change/dozer select
lever to the "Track width change" position
(B).
2. Push the control lever forward.
... The track width reduces
from 860mm to 700mm.
Pull the control lever backward.
... The track width increases
from 700mm to 860mm.
(A) "Fix"
(1) Track width change /
dozer select lever
(A)"Dozer"
(B)"Track width change"
(1) Control lever (A) "Reduce"
(B) "Increase"