OPERATOR'S MANUAL
Table Of Contents
- OPS - Excavator K008-3 (RA028-8222-2)
- List of Abbreviations
- General Symbols
- Foreword
- Safety First
- Contents Page
- Safe Operation
- Dealer Service
- Technical Data
- Description of Machine Parts
- Instrument Panel and Control Elements
- Before Start
- Operation of the Engine
- Excavator Operation
- Control Observations During Operation
- Running In of the New Excavator
- Starting
- Controls for Attachments
- Operation of the Boom
- Operation of the Arm
- Operation of Bucket
- Swivel (Unit Swing) Operation
- Boom Swing Operation
- Boom Swing Pedal
- Operation of Track Width Change and Dozer
- Driving
- Turns
- Up and Downhill Travelling
- Parking on a Slope
- Drive Speed Pedal
- Service Port Operation
- Important Information on Excavator Operation
- Operating Foldable ROPS
- Transporting the Excavator on a Truck
- Lifting of the Excavator
- Maintenance
- Regular Checks and Maintenance Work
- Other Adjustments and Replacements
- Troubleshooting
- Operation in Cold Weather Conditions
- Long Storage
- Recommended Oils
- Main Dimensions
- Lifting Capacity
33LIFTING OF THE EXCAVATOR
B Lifting Procedure for the
Excavator
To avoid personal injury or death.
A Do not lift the excavator other than at
the 3 points as illustrated.
A Do not use the ROPS for lifting the
excavator.
C General guidelines for lifting
1. Lifting position. (see right illustration)
(1) Pull in the boom completely towards
rear.
(2) Pull in the arm completely.
(3) Pull in the bucket completely.
(4) Swing the boom 0.17 to 0.26 rad. (10 to
15 degrees) to the right from the central
position.
(5) Insert the swing lock pin.
2. Attaching the chains / straps.
(1) Always hook the excavator at three
points. (one on the boom and right and
left of the dozer blade)
(2) Always use a shackle on each lifting
hole when attaching the straps.
(3) Use cushioning material at all places
where the straps contact the machine.
3. Tackle
Choose components with enough strength.
4. Lifting
(1) Lift slowly and safely
(2) Do not enter the excavator area when
lifting.
(3) Lift the excavator horizontally. (Modify
connections according to needs)
(1) Shackle