OPERATOR'S MANUAL
Table Of Contents
- OPS - Excavator U48-4 (RD45881312)
- Abbreviation List
- General Symbols
- Foreword
- Safety First
- Contents Page
- Safe Operation
- Dealer Service
- Technical Data
- Description of Machine Parts
- Instrument Panel and Control Elements
- Checks Before Start
- Daily Checks
- Checking the Devices
- Starter Switch
- Display Selector Switch
- LCD Display for Normal Operation
- Warning Lamp
- LCD Display for Warning
- Setting the Clock
- Reordering the year/month/day and Changing the AM/PM System to the 24 hour one
- Log Record
- Periodic Check
- If all the Check Points are not Displayed at a Glance on a Single Screen
- When the Checkup is Completed
- Horn Switch
- Working Light Switch
- AUX Port Flow Rate Limit Switch
- Auto Idle Switch
- Throttle Potentiometer
- Travel Speed Switch
- CAB Type Machines
- Air Conditioner
- Handling the Safety Devices
- Operation of the Engine
- Excavator Operation
- Running-In of the New Excavator
- Starting
- Driving
- Turns
- Up and Downhill Driving
- Parking on a Slope
- Operation of the Dozer
- Two Pattern Selection System (TPSS)
- Operation of the Boom
- Operation of the Arm
- Operation of the Bucket
- Unit Swing and Boom Swing Operation
- Auxiliary Port Operation
- How to Release Pressure Trapped in the Hydraulic System
- 1 Way or 2 Way Circuit Selection Valve Operation
- Auto Idle (AI) Operation
- Important Information on Excavator Operation
- Transporting the Excavator on a Vehicle
- Lifting of the Excavator
- Maintenance
- Maintenance Intervals
- Opening and Closing of Covers
- Daily Checks
- Checking Coolant Level
- Checking Fuel Level
- Checking Engine Oil Level
- Checking Hydraulic Oil Level
- Checking V-Belt
- Checking Radiator and Oil Cooler
- Checking Washer Liquid
- Cleaning Pre-Cleaner
- Checking and Cleaning Engine and Electrical Wiring
- Greasing Boom Swing Fulcrum
- Washing Whole Machine
- Greasing Front Attachments (without Bucket Pin and Boom Swing Fulcrum)
- Greasing Bucket Pin and Bucket Link Pin
- Regular Checks and Maintenance Work
- Other Adjustments and Replacements
- Troubleshooting
- Operation Under Cold Weather Conditions
- Long Storage
- Recommended Oils
- Appendices
- Lifting Capacity
- List of Screens
SAFE OPERATION-4
Before leaving the machine,
A Park the excavator on a firm, flat and level surface. If
this is not possible, park across the slope.
A Lower the attachments and the dozer blade to the
ground.
A Stop the engine.
A Release pressure in the hydraulic system.
A Lock all control levers.
A Remove the key.
A Lock the cab door (if equipped)
1. Observe all regulations concerning the transport of
excavators on public roads.
2. Use adequately long and robust ramps when loading
on the machine. (for details see "TRANSPORTING
THE EXCAVATOR ON A VEHICLE")
3. Do not change the running direction and to avoid
tipping over, do not try to swing the attachment
crosswise to the loading ramps.
4. Lower the attachment on the loading bed and release
the pressure from the hydraulic system.
After loading the excavator on the truck, block the
tracks with blocks and tie down the excavator at the
appropriate locations.
5. Avoid abrupt braking of the vehicle with the excavator
loaded. Sudden braking cause the excavator to move
and may cause a serious accident.
6. When towing the excavator or pulling a load, the load
must be less than the strength of the towing line
attached to excavator. The towing eye should not be
used for tie down or lifting of the machine.
3. AFTER OPERATION
(1) Pilot control lock lever (A) "Unlock"
(B) "Locked"
4. SAFE LOADING AND TRANSPORT OF
THE EXCAVATOR
(1) Chain
(2) Block
(1) Tow line