OPERATOR'S MANUAL
Table Of Contents
- OPS - Excavator U48-4 (RD45881312)
- Abbreviation List
- General Symbols
- Foreword
- Safety First
- Contents Page
- Safe Operation
- Dealer Service
- Technical Data
- Description of Machine Parts
- Instrument Panel and Control Elements
- Checks Before Start
- Daily Checks
- Checking the Devices
- Starter Switch
- Display Selector Switch
- LCD Display for Normal Operation
- Warning Lamp
- LCD Display for Warning
- Setting the Clock
- Reordering the year/month/day and Changing the AM/PM System to the 24 hour one
- Log Record
- Periodic Check
- If all the Check Points are not Displayed at a Glance on a Single Screen
- When the Checkup is Completed
- Horn Switch
- Working Light Switch
- AUX Port Flow Rate Limit Switch
- Auto Idle Switch
- Throttle Potentiometer
- Travel Speed Switch
- CAB Type Machines
- Air Conditioner
- Handling the Safety Devices
- Operation of the Engine
- Excavator Operation
- Running-In of the New Excavator
- Starting
- Driving
- Turns
- Up and Downhill Driving
- Parking on a Slope
- Operation of the Dozer
- Two Pattern Selection System (TPSS)
- Operation of the Boom
- Operation of the Arm
- Operation of the Bucket
- Unit Swing and Boom Swing Operation
- Auxiliary Port Operation
- How to Release Pressure Trapped in the Hydraulic System
- 1 Way or 2 Way Circuit Selection Valve Operation
- Auto Idle (AI) Operation
- Important Information on Excavator Operation
- Transporting the Excavator on a Vehicle
- Lifting of the Excavator
- Maintenance
- Maintenance Intervals
- Opening and Closing of Covers
- Daily Checks
- Checking Coolant Level
- Checking Fuel Level
- Checking Engine Oil Level
- Checking Hydraulic Oil Level
- Checking V-Belt
- Checking Radiator and Oil Cooler
- Checking Washer Liquid
- Cleaning Pre-Cleaner
- Checking and Cleaning Engine and Electrical Wiring
- Greasing Boom Swing Fulcrum
- Washing Whole Machine
- Greasing Front Attachments (without Bucket Pin and Boom Swing Fulcrum)
- Greasing Bucket Pin and Bucket Link Pin
- Regular Checks and Maintenance Work
- Other Adjustments and Replacements
- Troubleshooting
- Operation Under Cold Weather Conditions
- Long Storage
- Recommended Oils
- Appendices
- Lifting Capacity
- List of Screens
CONTENTS
STARTING WITH AN AUXILIARY BATTERY ....................................................... 26
Observe Following Guidelines when Starting with an Auxiliary Battery.......................... 26
CHECK POINTS AFTER STARTING THE ENGINE ............................................. 27
STOPPING THE ENGINE...................................................................................... 27
Engine Stop Button......................................................................................................... 27
Precautions in case of Overheat..................................................................................... 27
EXCAVATOR OPERATION ...................................................................................... 28
RUNNING-IN OF THE NEW EXCAVATOR........................................................... 28
Do not Work with Full Engine Rpm's or Full Loads during the First 50 Working Hours.. 28
Oil Change in the Run-in Stage...................................................................................... 28
Adjusting the Operator's Seat......................................................................................... 28
Seat Belt .........................................................................................................................29
STARTING............................................................................................................. 29
Pilot Control Lock Lever.................................................................................................. 29
DRIVING ................................................................................................................ 30
Drive Levers(Right,Left).................................................................................................. 31
TURNS................................................................................................................... 31
Pivot Turn ....................................................................................................................... 31
Spin Turn ........................................................................................................................ 32
UP AND DOWNHILL DRIVING.............................................................................. 33
PARKING ON A SLOPE ........................................................................................ 33
OPERATION OF THE DOZER .............................................................................. 33
TWO PATTERN SELECTION SYSTEM(TPSS) .................................................... 34
Pattern Change............................................................................................................... 34
OPERATION OF THE BOOM................................................................................ 35
OPERATION OF THE ARM................................................................................... 35
OPERATION OF THE BUCKET ............................................................................ 36
UNIT SWING AND BOOM SWING OPERATION.................................................. 36
Unit Swing Operation...................................................................................................... 36
Boom Swing Operation................................................................................................... 36
AUXILIARY PORT OPERATION ........................................................................... 37
Selecting the Action Modes ............................................................................................37
AUX Port Handling Procedure ........................................................................................38
Setting the Maximum Flow Volume ................................................................................ 40
HOW TO RELEASE PRESSURE TRAPPED IN THE HYDRAULIC SYSTEM...... 45
1-way or 2-way CIRCUIT SELECTION VALVE OPERATION ............................... 46
AUTO IDLE (AI) OPERATION ............................................................................... 47
IMPORTANT INFORMATION ON EXCAVATOR OPERATION ............................ 47
TRANSPORTING THE EXCAVATOR ON A VEHICLE............................................. 48
LIFTING OF THE EXCAVATOR................................................................................ 50
MAINTENANCE......................................................................................................... 52
MAINTENANCE INTERVALS ................................................................................ 52
OPENING AND CLOSING OF COVERS............................................................... 55
Opening/Closing of the Engine Hood ............................................................................. 55
Opening/Closing of the Side Cover ................................................................................55
Where to store the Tool .................................................................................................. 56
Where to store the Grease Gun...................................................................................... 56
Where to keep Operator's Manual..................................................................................57