Full Product Manual

19
burns. If a cabinet storage is to be provided, the risk can be reduced by installing a range
hood that projects horizontally a minimum of 5" (12.7cm) beyond the boom of the
cabinets.
Connect Range to Gas Supply
1. Install a manual gas line shut-off valve in the gas line in an easily accessed locaon
outside the range in the gas piping external to the appliance for the purpose of turning
on or shung off gas to the appliance.
2. Install male
1
/
2
inch flare union adapter to
1
/
2
inch NPT internal thread elbow at inlet
of regulator. On models equipped with standard twin burners, install the male pipe
thread end of the
1
/
2
inch are union adapter to the
1
/
2
inch NPT internal thread at inlet
of pressure regulator. Use a wrench on the regulator ng to avoid damage.
3. Install male
1
/
2
inch or
3
/
4
inch flare union adapter to the NPT internal thread of the
manual shut-o valve, taking care to secure the shut-off valve to keep it from turning.
4. The gas supply pressure for checking the regulator seng is 6 in.w.c. (Nature Gas) and
11 inch.w.c. (LP gas) connect exible gas line connector to the regulator on the range.
Posion range to permit connecon at the shut-off valve.
When all connecons have been made, make sure all range controls are in the posion
and turn on main gas supply valve.
5. Leak tesng
of the appliance shall be conducted according to the manufacturer’s
instrucons. Use some soap water (50% water and 50% soap) or a leak detector at all
joints and connecons to check for leaks in the system. Do not use a flame to check for
gas leaks.
FOR MORE DETAILS AND INFORMATION, PLEASE VISIT OUR WEBSITE
WWW.KUCHT.COM