Phau Ntawv Qhia
10
Now begin with the laying of the cable set to the outer noise generator. Lay the cable set through the
rubber boot under the carpet on the passenger’s side. After an appropriate laying to the outer noise
generator, connect the cable set to this one Figure 9
Figure 9
The re-assembly takes place in a backward sequence, afterwards the installation is successfully
completed.