Installation Manual
Table Of Contents
CPE70R quick Stat Guide www.kuwfi.com mancy@kuwfi.com
How to paired
1. Config Master/ Slave CPE
Put the switch to H, CPE will work as Mast. Put the switch to C, CPE will
work as Slave.
2.Config Master CPE
When bridge two CPEs, make one work as master: press "F" to make H/ C b
linking, and press "S" to change to "H", it will save automatically in 5 second
s
2. Point to Point Connection Press reset button on both master and slave CP
E, will start bridging.