User Guide

19. EXHAUST EMISSION CONTROL
SYSTEM
19-5
AIR INJECTION CUT-OFF
VALVE (A.I.C.V.)
REMOVAL
1. Remove the front right side cover. (
!
2-4)
2. Disconnect all the tubes that go to the air
injection cut-off valve.
3. Remove the air injection cut-off valve.
INSPECTION
1. Inspect the air injection cut-off valve
flow using a vacuum pump. If the flow is
not within the specified values, replace
with a new one.
2. The flow should be at least 30 liter/min
when a vacuum of 250mm/Hg is applied.
3. The flow should be at least 1.6 liter/min
when a vacuum of 320mm/Hg is applied.
4. Check each connecting tube for cracks or
damage and replace if necessary.
INSTALLATION
1. The installation sequence is the reverse of
removal.
When installing, be careful not to bend or twist the tubes
and check for proper installation.
The tube length is very important to its performance, use
the tube of same specification for replacement.
Vacuum Tube
Bolt
Air Injection Cut-off Valve
Vacuum Pump
Tube to Reed Valve
Air Inlet Tube
Air Injection Cut-off Valve