Quick Manual Instruction Manual

21
KEW6305
KEW6305
Demand Measurement :
DEMAND
Range
8. Demand Measurement :
DEMAND Range
8-1. Steps for measurement
Ensuring your safety
Preparation for measurement
Setting
Wiring
Demand measurement
* Measured demand values will be displayed on the LCD at the start of measurement.
Parameters for
DEMAND
Range
Parameters to be displayed on the LCD Unit
Target value W
Predicted value W
Present value W
Load factor %
Demand time
Max. demand value W
When max. demand value measured
SET UP Range
Basic Setting Measurement setting
Setting 01 Wiring systemSetting 09 Recording interval
Setting 02 Voltage range
Setting 10 Specifying rec. period or endless rec.
Setting 03 Clamp sensor Setting 11 Time period setting Time setting
Setting 04 Current range Setting 12 Time period setting Date setting
Setting 05 VT ratio
(if necessary)
Setting 13 Start of continuous measurement
Setting 06 CT ratio
(if necessary)
Setting 14 End of continuous measurement
Setting 15 Target demand
Setting 16 Demand measurement cycle
Setting 17 Demand warning cycle
Range