Quick Manual Instruction Manual
− 21 −
KEW6305
KEW6305
Demand Measurement :
DEMAND
Range
8. Demand Measurement :
DEMAND Range
8-1. Steps for measurement
Ensuring your safety
↓
Preparation for measurement
↓
Setting
↓
Wiring
↓
Demand measurement
* Measured demand values will be displayed on the LCD at the start of measurement.
● Parameters for
DEMAND
Range
Parameters to be displayed on the LCD Unit
Target value W
Predicted value W
Present value W
Load factor %
Demand time −
Max. demand value W
When max. demand value measured −
SET UP Range
Basic Setting Measurement setting
“Setting 01” Wiring system“Setting 09” Recording interval
“Setting 02” Voltage range
“Setting 10” Specifying rec. period or endless rec.
“Setting 03” Clamp sensor “Setting 11” Time period setting Time setting
“Setting 04” Current range “Setting 12” Time period setting Date setting
“Setting 05” VT ratio
(if necessary)
“Setting 13” Start of continuous measurement
“
Setting 06” CT ratio
(if necessary)
“Setting 14” End of continuous measurement
“Setting 15” Target demand
“Setting 16” Demand measurement cycle
“Setting 17” Demand warning cycle
Range