1.5 Outline of max demand measurement concept KEW6310
1.7 KEW6310
1.5 Outline of max demand measurement concept
In some coun tries, la rge co nsu mers of ele ctri ci ty w ill usua lly have a max imu m deman d con tra ct w ith th e pow er
company. Su ch co nt ract va ries from country to coun try . The following is an explana tion of a ty pical Japane se
maximum demand contract.
Maxi mum De mand co n tra ct
In such a contract the electricity tariff rates (i.e. for kWhr units) are based upon the consumer’s maximum
power demand. The maximum demand is the maximum of average powers recorded over a 30min intervals.
This is measur ed by the maxi mum de mand me ter belo ngin g to the pow er co mpany . Le t’s assu me th a t a pow er
company ha s the fo ll ow ing appli cabl e rate s.
$2 per KWhr unit for a recorded max demand 300KW during a year
$4 per KWhr unit for a recorded max demand 500KW during a year
$5 per KWhr unit for a recorded max demand 600KW during a year
Assuming that the consumer is on the 500kW/year rate (ie. $4), and the recorded max demand during a
particular day (say 15th Janu ary ) is 600kW . Then the new applicable rate from 1st February onwards will be the
600kW/year ra te (ie. $5 ) for th e next 36 5 days. If a y ear late r, on Feb ruary 1st the recorde d max imu m demand
is 300kW, then the new appl icable rate s w ill be ch ang ed to 300kW/y ea r rate (i.e . $2) for the subseq uen t 365
days. However i f during this pe riod, the max demand goes up again , and say 600kW i s recorded on 15 th March ,
the applicable rates change again to the 600kW/year rate (i.e.$5) for the subsequent 365 days.
Benefits of maximum demand control
It is thus important for consumers with such contracts to monitor closely flu ctuation s in their pow er demand to
ensure that their max demand limits are not exceeded and thus incur higher tariffs. Maximum Demand control is
more effec ti ve i n countries w ith higher electricity tariffs.
Status of maximum demand contract
In the past, in Japan, only consumers whose electricity supply was rated at 600kW or more used to enter into a
demand con tra ct. How ever, no w adays power companies in stall maxi mum d emand me ters a t all co n sumers
whose supply is rated 70kW or more.
Maximum Demand measurement limitations
N.B. The readi ngs fro m pow er co mp any max imu m dema nd mete r and fro m the 630 0 w ill no t ma tch compl etely
due to an obvious time-lag difference in the start of the integration period (eg.30mins) over which the max
demand is taken.