User Manual
KEW6310 11.5.2 Power quality – Measuring procedure (Unbalance rate)
KEW6310 11.28
11.5.2 Measuring Procedure
Steps for measurement
Ensuri ng your safety
See “Safety Warnings”.
↓
Getting started
See “Section 3 Getting started”.
↓
Settings
See “Section 4 Setting”.
↓
Wiring
See “Section 5 Wiring Configuration”.
↓
* measurements are possible at wiring configurations:
⑪, ⑫ and ⑬.
Unbalance rate See this section
Basic Setting Measurement Setting Save Setting
Wiring co n figu ra tion Interval Recordin g method
V Range Output threshold Recording start
VT Ratio Recording termination
Clamp Destination to save data
A Range Destination to save screenshot
CT Ratio
Filter
DC V
Frequency