Install Manual Part 3

SKY497
Installation Manual
C-1
Rev. C
APPENDIX C
INSTALLATION CHECKOUT
USING THE TIC T-49C FLIGHTLINE TESTER
C.1 INTRODUCTION
This section contains instructions for using the TIC T-49C Flightline Tester to do post-installation
checkout of the BFG Avionics Systems SKY497. Detailed setup, operation and maintenance information
for the T-49C Flightline Tester is provided in the T-49C Operating and Maintenance Instruction Manual.
NOTES
1. This procedure assumes familiarity with the set up and operation of the T-49C
Flightline Tester.
2. All test equipment used in completing these tests shall be calibrated in
accordance with the manufacturer's recommendations.
3. When the SKY497 is interfaced to an alternate display, reference Appendix E
while performing this checkout procedure.
This procedure will validate the installation and return to service of the BFGoodrich Avionics Systems
SKY497.
C.2 CONTROLS
All operating controls are located on the front of the WX-1000/SKY-497 display. Figure C-1 shows the
locations of the controls. Complete operating instructions for the SKY497 are provided in the SKY497
Pilot's Guide supplied with each system.
Figure C-1. Controls
OFF/BRT
Switch
Power is applied by rotating the knob clockwise past the detent. Continued
clockwise rotation increases display brightness.
1, 2, 3, & 4
Pushbuttons
Also referred to as soft-keys (1), (2), (3), and (4). In every operating mode a label
identifying the button function will be displayed next to the button.