User's Manual
Table Of Contents
- Cover
- 1-Welcome Letter
- 2-Table of Contents
- 3-Contacts
- 4-Quick Start Guide Rev 2
- 5-SIM Registration
- 6-Installation and Operations Rev 2
- 7-Component Maintenance Manual Rev 1
- SERVICE BULLETIN LIST
- RECORD OF CHANGES
- RECORD OF REVISIONS
- LIST OF EFFECTIVE PAGES
- LIST OF EFFECTIVE PAGES
- INTRODUCTION
- DESCRIPTION AND OPERATION
- TESTING AND TROUBLESHOOTING
- DISASSEMBLY
- CLEANING
- CHECK
- REPAIR
- ASSEMBLY
- FITS AND CLEARANCES
- SPECIAL TOOLS, FIXTURES AND EQUIPMENT
- ILLUSTRATED PARTS LIST
AVIATION RECORDERS
COMPONENT MAINTENANCE MANUAL
AIRBUS IRIDIUM SATCOM SYSTEM
SPECIAL TOOLS, FIXTURES AND EQUIPMENT
1. GENERAL
The Airbus Iridium System components, SDU p/n: 228E5733-00 and SCM p/n: 418E5733-
00) have been designated as Level-1 non-field-repairable Line Replaceable Units. There
are no special tools, fixtures and test equipment for Level-1 maintenance for the Airbus
Iridium System units. These units must be returned to L-3 Communications for all
maintenance tasks (i.e. disassembly, assembly, replacement parts, testing, and return to
service certification).
Special Tools and Test Equipment
Page 901
Jan. 21/14
23-28-01