Lake Controller Operation Manual
Lake Controller Operation Manual Rev 1.5.4
Lake-enabled Amplier Reference
253
are muted and a sequenced sweep is issued. After the verication procedure has been conducted, the
LOAD RESULTS window appears.
Simultaneous load verication of all Lake-enable ampliers on the network can be initiated from the
GLOBAL CONTROL tab. Please refer to section 20.9.
LoadSmart verication can be initiated from the
PLM and PLM+ front panel, with a reduced set of
results displayed on the front-panel LCD. Refer to
the relevant Operation Manual for further info.
Figure 20-9: Load Verication Results
20.9.5 Settings
The set of buttons at the foot of the page allow the user to select the most convenient measurement units
for the load verication system and cable resistance calculation. The options are:
▸ TEMPERATURE – °C or °F
▸ CABLE LENGTH – Meters or Feet
▸ CABLE GAUGE – AWG numbers or as mm2 cross-section