Manual

3. Installation
8
PLM+ SERIES Operation Manual rev 1.0.0
2.3. Additional Documentation
This document, the PLM+ Operation Manual, serves as the primary reference source for detailed information
on the installation and operation of PLM+ Series Powered Loudspeaker Management systems. It also provides
detailed information on set-up and conguration using the front-panel interface.
If you intend to use the device as part of a networked system, or access features via the Lake Controller, please
refer to the various supporting documents which can be located via these methods:
Start > Programs > Lake Controller > Documentation (after installing Lake Controller software)
On the included installer USB key, or via the downloaded software installer
Online at: http://labgruppen.com/products/documentation/
3. Installation
3.1. Unpacking
Carefully open the shipping carton and check for any damage to the device or the supplied accessories. Every
Lab.gruppen product is tested and inspected before leaving the factory and should arrive in perfect condition. If
any damage is discovered, please notify the shipping company immediately. Only the consignee may initiate a
claim with the carrier or their insurers for damage incurred during shipping. Save the carton and packing materials
for the carrier’s inspection.
In addition to the PLM+ Series device, the shipping carton includes the following items:
PLM+ Series Quick Start & Field Reference Guide
AC mains lead (power cable) with Neutrik® powerCON® connector
Rear brackets for additional rack support (pair) along with associated mounting hardware
Software Installer and Documentation USB key
Please keep the original carton and associated packaging to facilitate shipping of the device should the need arise.
3.2. Mounting
Airow for cooling the device is from front panel (intake) to rear panel (exit). Please ensure that no objects, such as
rack doors or lids, are placed at the front or rear of the rack to ensure that airow is maximized. This device has no
top or bottom vents and therefore PLM+ units may be stacked directly on top of each other.
Sufcient space should be available at the front of the rack to accommodate the handles, and at the rear to
accommodate connectors and cables; allowance must be made for cable or loom bends within a rack.