User guide
Product Service 1-800-522-7658 
6 
Original instructions 
C
C
h
h
a
a
p
p
t
t
e
e
r
r
3
3
:
:
G
G
e
e
t
t
t
t
i
i
n
n
g
g
S
S
t
t
a
a
r
r
t
t
e
e
d
d
Now that the installation is properly prepared, you are ready to inspect, 
install, and certify the PuriCare Procedure Station. This chapter covers how 
to: 
•  Unpack and move the Procedure Station. 
•  Install the cabinet. 
•  Connect the electrical supply source. 
•  Connect the service lines. 
•  Connect to an exhaust system (optional). 
•  Arrange certification of the Procedure Station. 
Tools required for installation the procedure station include two 1/2" 
wrenches, a flat-blade screwdriver, a #2 Phillips screwdriver, and a 
carpenter’s level. 
Note: The Procedure Station models weigh between 400–700 lbs. (182-318 
kg). The shipping pallet allows for lifting with a mechanical lift truck or 
floor jack. If you must lift the product manually, use at least six (6) persons 
and follow safe-lifting guidelines. 










