Owner manual

Product Service 1-800-522-7658
6
C
C
h
h
a
a
p
p
t
t
e
e
r
r
3
3
:
:
G
G
e
e
t
t
t
t
i
i
n
n
g
g
S
S
t
t
a
a
r
r
t
t
e
e
d
d
Now that the installation is properly prepared, you are ready to inspect,
install, and certify the PuriCare Procedure Station. This chapter covers how
to:
Unpack and move the Procedure Station.
Install the cabinet.
Connect the electrical supply source.
Connect the service lines.
Connect to an exhaust system (optional).
Arrange certification of the Procedure Station.
Tools required for installation include two 1/2" wrenches, a flat-blade
screwdriver, a #2 Phillips screwdriver, and a carpenter’s level.
Note: The Procedure Station models weigh between 500-700 lbs. (228-318
kg). The shipping pallet allows for lifting with a mechanical lift truck or
floor jack. If you must lift the product manually, use at least six (6) persons
and follow safe-lifting guidelines.
Note: The side panels must be removed to access the fasteners that secure the
Procedure Station to the pallet. DO NOT ATTEMPT TO LIFT BY THE
SIDE PANELS; DAMAGE WILL OCCUR.