Section 3 - Heater Installation
TYPICAL INSTALLATION:
HEATER/CHIMNEY PACKAGE
Ceiling-Mount Through-the-Roof
1. Double-Wall Chimney Flue (Class-A)
2. Roof Penetration
3. Single-Wall Chimney Flue
4. Barometric Damper & Tee
5. Ceiling-Mounted Heater Unit
6. Burner
7. Secondary Air Regulator
8. Oil-Bypass Pressure Regulator
9. Ceiling-Mount Support Rods
(not included)
10. Primary Strainer
11. Fill Pipe (for priming)
12. Fuel Pump
13. Fuel-Pickup Assembly (in tank)
14. Tank Drain
Compressed-air supply, electrical shuto switch, tank vent,
and additional chimney material not included. Installation
congurations vary. Additional materials will be necessary.
Contact Lanair for Assistance with special circumstances.
Heater must be hung at least 8 ft.
above the oor
If the heater is not installed on a
tank stand supplied by Lanair, a
metering pump may be desired in
order to eliminate the need to adjust
oil ow from a distance
Use 1/2” O.D. soft copper fuel line
(not included) from pump to burner
(3/8” O.D. with metering pump)
Keep at least 3 ft. to barometric
damper from any fan, air source/
return, etc.
Use 3/8”-16 TPI threaded rod (not
included) to hang the heater from
load-bearing structure