User guide

Visit our website at: www.lanair.com
17
Section 9 - Boiler Installation
Figure 7
Figure 8
(4) 12mm x 50mm studs
(4) 12mm x 50mm studs
(4) 12mm washers
(4) 12mm washers
(4) 12mm nut
(4) 12mm nut
Supply Manifold
Return Flange
Gasket
Gasket
Gasket
Diffuser
TOP OF BOILER
BOTTOM OF BOILER
Note: Threads used on the studs is metric. Any attempt to use standard (English) thread-
ed studs in place of those supplied will damage the boiler block.
!
Manifold and Diffuser Installation
1. Attach supply manifold as indicated in Fig. 7. Install return port diffuser and attach return flange as shown in Fig. 8.
NOTE: Make sure diffuser slots face upward (see Fig. 8).