User Manual
Table Of Contents
- 10-0097 - Manual Cover.pdf
- Concentrator Manual 98-1031-1
- Table of Contents
- Preface
- Pre-Installation
- Field Configuration
- Concentrator Installation
- RF Filter Enable/Disable and Battery Replacement Kit
- Performing System Upgrades
- Troubleshooting
- Product Specifications
- Compliance
- Bench Testing
- About Firmware
- About Programming and Diagnostic Cables
- Sample Survey Sheet
- Power Cable Installation
- Glossary
- Index
Glossary Landis+Gyr
104 98-1031 Rev AA Series IV Concentrator U and I Guide
RAM Random Access Memory
RIMS Retrofit Information Management System, an Oracle program managing the
shop floor assembly and programming of modules, also stands for myriad of
data tables. Exchanges information with OCDB.
RPT Revenue Protection Technician, utility employee responsible for identifying and
taking corrective action on theft of service cases.
SNR Signal to noise ratio: Comparison of the usable signal being transmitted to the
undesired signal, usually expressed in decibels; a quality measure of a
transmission.
TOP Take Out Point; also called a Collector.
TOU Time of Use. Specific meter rate where the usage is captured in intervals.
WAN Wide Area Network, consists of data gathering devices like Concentrators and
endpoints.
XD Cross-Dock