Appendix C - Bench Testing Landis+Gyr
84 98-1031 Rev AA Series IV Concentrator U and I Guide
Testing Concentrators
The steps involved in the test process are explained below.
1. Configuration.
Configure the concentrators in the test bench 24 hours before starting the test.
2. Verification.
Perform the actual test verification procedure at least 24 hours (up to 48 hours) prior to the
deployment.
3. Reconfiguration.
Before the final deployment, reconfigure concentrators for the utility Network ID. Modify the
default destination address to one of the utility TOPs.
Configuration
Both the Console/LAN Packet Protocol cable (PN 19-1126) and the Network Configuration
Manager application are required to configure the WAN radio in the concentrator. The test Network
ID and the Default Destination address of the test TOP are highlighted in Figure C.2.
Figure C.2 Sample Network Configuration Manager settings for concentrators