User Manual
Table Of Contents
- 14-0364 - Exhibit Cover.pdf
- GPR2 Installation Guide 98-1135.pdf
- Chapter 1: Pre-Installation 7
- Chapter 2: Index Cover Pulser Install and Operation Start Up 25
- Chapter 3: American GPR Index Cover & GPR Install 31
- Chapter 4: Rockwell GPR Index Cover & GPR Install 47
- Chapter 5: Schlumberger GPR Index Cover & GPR Install 57
- Chapter 6: Sprague GPR Index Cover & GPR Install 69
- Chapter 7: Electronic Pulser Installation 85
- Chapter 8: Dresser Roots Installation 99
- Appendix A: GPR Waterproofing 113
- Appendix B: Installation in Hazardous Locations 121
- Table 1-1. Typical Gas Meter Module Installation Tool List
- Table 1-2. American Meter Index Cover Mini Switch Kits
- Table 1-3. American Large Diaphragm Meter Dial Wheels
- Table 1-4. American GPR + Brackets Kits
- Table 1-5. Kit, GPR Installation, American Large Diaphragm, Alternative Orientation #45-1189
- Table 1-6. Kit, GPR Installation, American Large Diaphragm, Behind Index #45-1190
- Table 1-7. Kit, American Large Diaphragm Alternative Orientation GPR, #45-1193
- Table 1-8. Hardware Kit, American Large Diaphragm #45-1203
- Table 1-9. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-10. GPR Cover Mounting Kit #45-1042
- Table 1-11. Rockwell Large Diaphragm Meter GPR Index Cover Kit
- Table 1-12. Rockwell Large Diaphragm Meter GPR Dial Wheel
- Table 1-13. GPR Installation Kit for Rockwell 750 Large Diaphragm Meter #45-1186
- Table 1-14. Kit, Rockwell Large Diaphragm Index Cover Hardware #45-1169
- Table 1-15. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-16. Schlumberger Large Diaphragm Meter GPR Index Cover Kit
- Table 1-17. Schlumberger Large Diaphragm Meter GPR Back Mount Wheel
- Table 1-18. Schlumberger Large Diaphragm GPR Kit #45-1187
- Table 1-19. Kit, Schlumberger Large Diaphragm Index Cover Hardware # 45-1171
- Table 1-20. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-21. Sprague Large Diaphragm Meter GPR Kit
- Table 1-22. GPR Dial Wheels
- Table 1-23. GPR Installation Kit for Sprague Large Diaphragm Meters #45-1188
- Table 1-24. Sprague Large Diaphragm Index Cover Hardware Kit #45-1114
- Table 1-25. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-26. Rotary Gas Meter Module Installation Tool List
- Table 1-27. GPR Rotary Meter Cables
- Table 1-28. GPR Installation Components for Rotary Gas Meters
- Table 1-29. GE AMR Adapter Kit
- Table 1-30. Gridstream American Residential Module
- Table 1-31. Index with Consumption Pointers Removed
- Table 2 - 1. Single Form-C Volume Wiring Definitions
- Table 7 - 1. Definitions
- Table 7 - 2. Single Form-A Volume Input Definitions
- Table 7 - 3. Two Form-A Volume Inputs Wiring Definitions
- Table 7 - 4. Two Form-A and Alarm Wiring Definitions
- Table 8 - 1. 01-1337 Index Parameters
- Table 8 - 2. M120-1 Dial Wheel and Seals Hardware Kit #45-1219
- Table 8 - 3. American Index, Pointers Removed, GE AMR (Kit #45-2400)
- Table 8 - 4. LED Startup Patterns
- Table B - 1.
Chapter 3 - American GPR Index Cover & GPR Install Landis+Gyr
42 98-1135 Rev AB Installation Guide
GPR Mounting
1. Using two #12-24 x 1/2 inch screws (part# 22-0185), install the GPR Mini Switch cover
assembly as shown in the following photographs.
A CAUTION: Check the index cover switch cable assembly for nicks, abrasions, or any damage
prior to installing the assembly onto the meter.
2. Install a new index cover gasket as required. Tighten the screws to 20 inch-pounds (± 5 inch-
pounds.
Figure 3 - 26. Tighten Front and Rear Cover Screws to 20 in-lbs (± 5 in-lbs)
U WARNING: Take care not to pinch the index cover switch cable assembly in any way,
especially during the following installation steps:
During index cover and cable assembly installation onto the meter.
During GPR enclosure cover installation.
Between the GPR and meter brackets and meter.
3. Install front and rear index cover tamper seals.
4. Coil the excess cable. Route it behind the index cover and dress it beneath the GPR bracket.
Figure 3 - 27. GPR at C enter Rear - Using 28-1441Bracket
5. Secure the cable to the bracket immediately below the GPR housing with a black nylon zip tie as
shown in Figure 3 - 28.