Landis+Gyr Chapter 4 - Rockwell GPR Index Cover & GPR Install
Installation Guide 98-1135 Rev AB 51
Figure 4 - 10. Shim insertion
7. Press the dial wheel upward against the shim. The wheel must be held flush with the shim while
tightening the screws.
8. Tighten each screw a few turns at a time so that the two wheel halves remain parallel with each
other, keeping the dial wheel hole centered on the shaft. Tighten the screws to 3.5 inch-pounds ±
0.5 inch-pound).
U WARNING: To avoid damaging the dial wheel, take care not to overtighten the set screws.
9. Remove the shim. Verify that:
the index shaft rotates freely
the wheel does not wobble on the shaft or rub against the frame
Installing the Index
1. Install the index and frame assembly onto the meter.
2. Align the index drive shaft arm with the meter as shown in the next figure.
3. Using the 5/16-18 x 3/8” index frame screws that were set aside at the beginning of this
procedure, tighten the screws to 18 foot-pounds. ± 2 foot-pounds.
NOTE: For proper meter operation, the index frame screw tabs should be about 90 degrees
(perpendicular) to the upper portion of the frame containing the index.