User Manual
Table Of Contents
- 14-0364 - Exhibit Cover.pdf
- GPR2 Installation Guide 98-1135.pdf
- Chapter 1: Pre-Installation 7
- Chapter 2: Index Cover Pulser Install and Operation Start Up 25
- Chapter 3: American GPR Index Cover & GPR Install 31
- Chapter 4: Rockwell GPR Index Cover & GPR Install 47
- Chapter 5: Schlumberger GPR Index Cover & GPR Install 57
- Chapter 6: Sprague GPR Index Cover & GPR Install 69
- Chapter 7: Electronic Pulser Installation 85
- Chapter 8: Dresser Roots Installation 99
- Appendix A: GPR Waterproofing 113
- Appendix B: Installation in Hazardous Locations 121
- Table 1-1. Typical Gas Meter Module Installation Tool List
- Table 1-2. American Meter Index Cover Mini Switch Kits
- Table 1-3. American Large Diaphragm Meter Dial Wheels
- Table 1-4. American GPR + Brackets Kits
- Table 1-5. Kit, GPR Installation, American Large Diaphragm, Alternative Orientation #45-1189
- Table 1-6. Kit, GPR Installation, American Large Diaphragm, Behind Index #45-1190
- Table 1-7. Kit, American Large Diaphragm Alternative Orientation GPR, #45-1193
- Table 1-8. Hardware Kit, American Large Diaphragm #45-1203
- Table 1-9. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-10. GPR Cover Mounting Kit #45-1042
- Table 1-11. Rockwell Large Diaphragm Meter GPR Index Cover Kit
- Table 1-12. Rockwell Large Diaphragm Meter GPR Dial Wheel
- Table 1-13. GPR Installation Kit for Rockwell 750 Large Diaphragm Meter #45-1186
- Table 1-14. Kit, Rockwell Large Diaphragm Index Cover Hardware #45-1169
- Table 1-15. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-16. Schlumberger Large Diaphragm Meter GPR Index Cover Kit
- Table 1-17. Schlumberger Large Diaphragm Meter GPR Back Mount Wheel
- Table 1-18. Schlumberger Large Diaphragm GPR Kit #45-1187
- Table 1-19. Kit, Schlumberger Large Diaphragm Index Cover Hardware # 45-1171
- Table 1-20. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-21. Sprague Large Diaphragm Meter GPR Kit
- Table 1-22. GPR Dial Wheels
- Table 1-23. GPR Installation Kit for Sprague Large Diaphragm Meters #45-1188
- Table 1-24. Sprague Large Diaphragm Index Cover Hardware Kit #45-1114
- Table 1-25. GPR Assembly w/ Universal Bracket #45-1185
- Table 1-26. Rotary Gas Meter Module Installation Tool List
- Table 1-27. GPR Rotary Meter Cables
- Table 1-28. GPR Installation Components for Rotary Gas Meters
- Table 1-29. GE AMR Adapter Kit
- Table 1-30. Gridstream American Residential Module
- Table 1-31. Index with Consumption Pointers Removed
- Table 2 - 1. Single Form-C Volume Wiring Definitions
- Table 7 - 1. Definitions
- Table 7 - 2. Single Form-A Volume Input Definitions
- Table 7 - 3. Two Form-A Volume Inputs Wiring Definitions
- Table 7 - 4. Two Form-A and Alarm Wiring Definitions
- Table 8 - 1. 01-1337 Index Parameters
- Table 8 - 2. M120-1 Dial Wheel and Seals Hardware Kit #45-1219
- Table 8 - 3. American Index, Pointers Removed, GE AMR (Kit #45-2400)
- Table 8 - 4. LED Startup Patterns
- Table B - 1.
Landis+Gyr Chapter 6 - Sprague GPR Index Cover & GPR Install
Installation Guide 98-1135 Rev AB 71
Sprague Mini Switch Kit Installation
U WARNING: The Front mount dial wheel must be used with metal pointer indexes.
The Balanced Dial wheel must be used on plastic pointer indexes.
A CAUTION: Take care not to over-tighten the set screws to avoid damaging the index pointer
and dial wheel.
Installing Front Mount Dial Wheels on Metal Pointer Indexes
1. Remove the index from the meter. Place the screws aside for re-use at the end of this process.
U WARNING: To maintain proper clearance, the Front mount dial wheel must be installed so
that, if alignment slots are present, the alignment slots on each wheel half are on top as
shown in Figure 6 - 5.
Figure 6 - 5. Alignment Slots Top of Each Wheel Half
NOTE: For wheels WITHOUT alignment slots, the dial wheel has no top or bottom, and there is no
special consideration regarding dial wheel assembly.
2. Insert screws into the notched dial wheel half.
Figure 6 - 6. Notched Wheel Half with Screws Inserted
3. Rotate the index drive mechanism so that the metal proving/test pointer is in an upward
direction.