User Manual

Table Of Contents
Landis+Gyr Chapter 6 - Sprague GPR Index Cover & GPR Install
Installation Guide 98-1135 Rev AB 77
A CAUTION: Check the index cover switch cable assembly for nicks, abrasions, or any damage
prior to installing the assembly onto the meter.
3. Coil the excess cable and route it behind the bracket as shown in Figure 6 - 19. Position the cable
behind the bracket and secure the cable to the bracket immediately below the GPR housing with
a black nylon zip tie. Do not completely tighten the zip tie. The cable must remain free to move
until the GPR has been installed on the meter.
Figure 6 - 19. Excess Coiled Cable Attached Beneath GPR Bracket
Figure 6 - 20. Excess Coiled Cable Attached Beneath GPR Bracket
U WARNING: Take care not to pinch the index cover switch cable assembly in any way,
especially during the following installation steps:
During index cover and cable assembly installation onto the meter.
During GPR enclosure cover installation.
Between the GPR and meter brackets and meter.
4. Install the GPR index cover and GPR assembly over the meter dial index as shown in the next
figure. The cover must be installed with the 1/8 inch thick cork gasket provided with the GPR
index kit.
Loosely
secure the
excess cable
to the bracket
with a black
zip tie