FCC Part 15 Subpart C Transmitter Certification Frequency Hopping Spread Spectrum Transmitter FCC ID: R7PTOP04 FCC Rule Part: 15.247 ACS Report Number: 05-0327-15C Manufacturer: Cellnet Technology, Inc. Model: Take Out Point (TOP) Installation Guide 5015 B.U.
Title: SOP Takeout Point Installation Doc. Number: XX-XXXX Revision: 01 Page 1 of 9 Revision History ECO/ECN Rev XXXXX 01 Date Author Page Description G. Farmer ALL INITIAL RELEASE PROPRIETARY INFORMATION NOTICE: THIS DOCUMENT CONTAINS TRADE SECRETS AND CONFIDENTIAL INFORMATION OF CELLNET AND SHALL NOT BE DUPLICATED IN WHOLE OR IN PART OR USED OR DISCLOSED FOR ANY PURPOSE OTHER THAN THAT APPROVED BY CELLNET. © Cellnet 2005. All rights reserved.
CELLNET 313-B N.
Contents CONTENTS ...........................................................................................................................................................2 FIGURES................................................................................................................................................................2 ACRONYMS..........................................................................................................................................................
Related Documents Document Title Part Number Revision Date Take Out Point programming guide 1. Cellnet Network The CellNet Automated Meter Reading network is used to transfer information from a number of endpoints usually distributed over a large geographical area. The most common endpoints are from electrical, gas and water meters. Additional potential endpoints include parking meters, vending machines and copiers.
Material Provided by Cellnet Wood Utility Pole Steel Street Light Pole Padmount XFMR Takeout Point X X X LAN omni whip antennas X X X WAN omni whip antenna X X X X Streetlight head adapter RF coaxial cables** AC power quick disconnect connector with 8 ft. or 18 ft. wire attached Female N – bulkhead connectors X X X X X X X X X MCC strap mounting brackets ** These come in different lengths, 5, 10, 15, 20, and 25, are most commonly used 4.1.
5. Customer Notification/Authorization 5.1. Appointment for building access The Below statement is a placeholder until statement can be reviewed. Cellnet shall provide a point of contact for each building that needs access by the contractor. It shall be the contractor’s responsibility to schedule the required appointments and to make notifications to the appropriate building owners, managers or tenants before performing the TOP installation. 5.2.
The Below statement is a placeholder until statement can be reviewed. The contractor shall provide a bucket truck for installations requiring them. A bucket truck is used for most wood and streetlight pole installations. The contractor shall comply with all local traffic ordinances while performing the TOP installations. 7. Installation • • • 7.1. General For every TOP that is to be installed, a TOP Installation Sheet will be provided.
7.4.1. STREET LIGHT POLE (OTHER THAN WOOD) The final guidelines provided by the utility or municipality determine where the TOP can be installed. It is the contractor’s responsibility to know and follow the utility or municipality guidelines before installing the TOP and antenna. 7.4.2. TOP INSTALLATION PROCEDURE 1. Verify the TOP and antenna can be mounted on the pole as indicated on the TOP Installation Sheet. If the TOP and/or antenna cannot be mounted as indicated, contact a Cellnet Inc.
7.4.3.2. TOP Installation procedure 1. Verify the TOP and antenna can be mounted on the pole as indicated on the installation sheet. If the MCC and/or antenna cannot be mounted as indicated, contact a Cellnet Inc representative and proceed to the next installation site. 2. Drill two 3/4" diameter holes through the wooden pole at 12 1/2 inches center to center. The holes should be positioned to ensure the TOP would be located at the height and direction described in the TOP Installation Sheet. 3.