User's Manual
Table Of Contents
- _
- I. Introduction and contacts:
- II. Materials and Equipment V2
- III. Procedures and Diagram Assembly:
- IV. Maintenance :
- IV.1 Limits on Maintenance:
- IV.2 Useful maintenance tools:
- IV.3 Vest Tests:
- IV.4 Failure Diagnostic procedures:
- IV.5 Preparation and reception of the maintenance units:
- V. Safety and Recycling:
- VI. EC DECLARATION OF CONFORMITY
- VII. FCC AND IC COMPLIANCE
- VIII. Annexes :
%1%0 A-##(
")(#FBHF(FHF"2'21
F2'12"-'H1FF.FF2'12"-!
,#,#(#
/))#$%&'"
"*,/,###
,3
➢ 7 @'I#
➢ F'I#(#./*(<!
4!
V.2 Recycling:
)' ' &'& A # &'& 7'." A
.')'#'.%
0'='(
,)##.((#*
(2I)FHF"2'21F2'12"-
% 266F
This document is the property of LASER GAME EQUIPEMENT
Any disclosure, copying, even partial, is prohibited without the prior written consent of the owner
Page 39/46