Specification

Dalton Enterprises, Inc., 131 Willow Street, Cheshire, CT 06410
Phone 800-851-5606 Fax (203) 271-3396 www.latexite.com
Revised 09/28/16
TECHNICAL DATA SHEET
Latex•ite
®
OPTIMUM
®
DRIVEWAY SEALER
Manufacturer Product#: 10852
UPC#: 090932108523
Appearance:
Thick brown liquid. Dries black.
Maximum VOC:
Less than 25 g/L
Application Temperature:
55º F and rising.
Specific Gravity:
1.3-1.5
Viscosity:
5,000-10,000 cps
Weight Per Gallon:
10.8-11.6 lbs. per gallon
Color:
Brown in liquid state. Dries black.
Consistency:
Thick liquid.
Boiling Point:
>212º F
Cure Time (50% relative humidity, 7F):
24-48 hours.
Freeze ability:
Do not allow to freeze.
Container Size & Weight:
4.75gallons, Approximately 55 lbs.
Latex·ite
®
Optimum
®
Driveway Filler Sealer is an asphalt emulsion based sealer designed to beautify and protect. Optimum
®
will leave a deep black color while providing strength and flexibility with its advanced polymer system. Latexite
®
Optimum
®
is
an EZ-Stir formulation saving you time and making it easy to apply!
Features:
8 year warranty
Fiber reinforced for maximum strength
Premium no stir formula…save time and effort
Advanced polymer formula
Non skid formula
Apply with Seal Right Squeegee (Roller is wrong applicator and voids warranty)
*Note: Product dries black…is brown only in liquid form.
Coverage rates vary depending upon the condition of the existing blacktop. Smooth & previously sealed driveways will
average 400-500 square feet per pail. Rough & unsealed surfaces will average 300-400 sq. ft. per one 4.75 gallon pail. Rough
/ road-grade asphalts with larger aggregate can cause lower than normal coverage rates. Thin coats are recommended as thick
coats will result in uneven coverage, tracking, and curing problems. A second coat can be applied 24 hours after first
application.
Sweep and clean off entire driveway using Latex•ite
®
CLEANER/DEGREASER. Scrub oil, gas spots, stains and rinse with
water. Apply Latex•ite
®
OIL SPOT PRIMER to any oil spots/stains using a paint brush. Allow Latexite
®
OIL SPOT
PRIMER to dry ½ hour prior to sealing over. If pavement is extremely hot, apply a fine water mist prior to sealing, but avoid
PHYSICAL PROPERTIES & PERFORMANCE
FEATURES
COVERAGE
SURFACE PREPARATION

Summary of content (3 pages)