Installation Guide

Preparation/
Assembl
y
3
1
Steps
1-3
2
Shut off main water supple before installation.Then determine the
depth of the embedded hole.Ensure the hole deep in between 2 12/ 25”
to 5 11/14”.
Put the embedded part into the hole,draw the location of the mounting
holes.Make sure that
the level of location of embedded with
spirit level .
Then remove the
embedded part ,drilling with Φ2/5” drill and put the
setscrew in the mounting holes and place the embedded part on the
setscrew,tighten the screws with a
adjustable wrench.
5 3/10”
max 5 11/14“
2/5”
Connect the hot & cold tubehot tube be Connected to the hot water
inlet is marked “H” , cold tube be Connected to the cold water inlet is
marked “C”. Turn on water supply to check if there is leakage for every
components.
Cold tube
Hot tube
ΦΦFinish floor
ΦΦFinish floor
min 2 12/25“
2-<3/4”-14NPT>