7. Storage and Scrap
7.1 Storage
When the equipment requires long-time storage:
Disconnect the power supply
Lubricate all the parts requiring lubrication: mobile
contact surface of the carriage, etc.
Empty all the oil/liquid storage units
Put the plastic cover over the equipment for dust
protection
7.2 Scrap
When the equipment service life is expired and can no
longer be used, disconnect the power supply, and properly
dispose of as per relevant local regulations.
8.
Tools for Installation and
Adjustment
To ensure proper installation and adjustment, please
prepare the following tools:
Tool Model
Leveling instrument Carpentry type
Chalk line Min 4.5m
Hammer 1.5kg
Medium crescent wrench 40mm
Open-end wrench set 11mm-23mm
Ratchet socket set
Flat Screw driver 150mm
Rotary hammer drill 20mm
Concrete drill-bit
19mm
9. Unpacking
Open the packing box: remove the packing materials and
inspect the lift for any sign of shipment damage. Check by
packing list to see if the main parts and accessories are
complete.
Keep the packing materials away from the children to avoid
danger: if the packing materials cause the pollution, they
shall be treated properly.
JB/T982-77 seal gasket 14
JB/T982-77 seal gasket 14
JB/T982-77 seal gasket 14