Product Manual

34
Attach the two (2) provided white nylon cable guides using the retaining rings onto
the horizontal metal post just above the carriage locking mechanism on the slave
side column. Inspect the metal post for any paint overspray and clean with
sandpaper if necessary. Use a small amount of general purpose grease on the metal
post prior to installing these cable guides. Attach the steel cable to the large metal
post on the slave side column side using the provided cable clamps. See the photo
below for reference.
Slave Side Column
Next route the steel cable under the nylon cable guide as shown above on the
inside of the column and up into the bottom hole of the metal cable guide on the
mounted on top of the column. Continue to route the cable over the top of the metal
roller wheel on the metal cable guide and over the top of the metal cable guide
mounted on the overhead beam and exit on the metal cable guide hole as shown in
the metal cable guide photo above. Complete the routing of the cable across the
overhead beam and down the power unit column repeating the same route used on
the slave side column. Route the steel cable through the white nylon cable guide
ABOVE the carriage release on the power unit side and then connect the cable as
shown below.