Product Manual

48
RETURNING TO SERVICE:
Check the lift and the immediate area around the lift to ensure that
nonessential items,, tools and parts are removed and that the lift
components are operationally intact.
Check the work area to ensure that all employees have been safely
positioned or removed from the work area.
Notify all employees that the lockout/tagout is going to be removed and
the lift is going to restarted.
Remove the lockout/tagouts in the reverse order as the installation.
Verify the proper operation of the equipment.
Notify affected employees that the maintenance/service is completed and
the machine is ready for operation.
ELECTRICAL
240VOLTS
AT THE LIFT, PRESS THE
EMERGENCY STOP BUTTON
COMPLETELY TO DE-ENERGIZE
THE CONTROL BUTTONS (IF
APPLICABLE).
AT THE DISCONNECT PLANEL,
PLACE THE DISCONNECT
HANDLE IN OFF POSITION.
ATTACH A MULTIPLE LOCUOUT
DEVICE. LOCK AND TAG.
DANGER: LINE SIDE OF
DISCONNECT REMAINS
ENERGIZED
ATEMPT TO RESTART THE
SYSTEM, THE SYSTEM MUST
NOT START. VISUALLY VERIFY
OPEN DISCONNECTS AND
LOCKING DEVICE INSTALLED.
PNEUMATIC
UPTO
160PSI
SLOWLY CLOSE LOCKOUT
VALVE TO RELEASE AIR
PRESSURE GRADUALLY.
ATTACH MULTIPLE LOCKOUT
DEVICE, LOCK AND TAG.
DANGER: LINE SIDE OF
DISCONNECT REMAINS
PRESSURIZED
VERIFY THE VALVE IS CLOSED
AND LOCKOUT DEVICE IS
PROPERLY ATTACHED.
OPERATE THE PNEUMATIC
SYSTEM TO ENSURE THE
SYSTEM IS DE-ENERGIZED. IT
MAY BE NECESSARY TO BLEED
THE SYSTEM OF REMAINING
COMPRESSED AIR, THIS CAN
BE PERFORMED AT THE BASE
OF THE WATER SEPARATOR
BOWL.