Installation Guide

EasyBase
Shower & Pan
Installation Instructions
Gelcoat & Solid Surface Bathware
14. A torpedo level should be placed from oor to insure
the unit has proper slope and drainage. If unit does
not drain properly, the unit must be pulled back up to
determine where the problem lies. This should be done
immediately after step 14 before the materials have had a
chance to set.
15. Unit should be walked in and found to be stable and
without ex.
16. All bracing can be removed after 72 hours after Liquid
Nails Construction adhesive has been applied.
**THE DRAIN CONNECTION SHOULD BE TIGHTENED
AFTER THE FLOOR HAS BEEN BRACED, CURED, AND THE
BRACE REMOVED i.e. 72 HOURS AFTER INSTALL.
**CHECK THE FLOOR TO INSURE THERE ARE NO HIGH
SPOTS AND THE DRAFT HAS BEEN MAINTAINED.
See Picture 6
**ATTENTION: THE THRESHOLD MUST BE FLAT ACROSS
THE FULL WIDTH WITH NO BOW AND LEVEL TO THE
FLOOR.
Following the appropriate installation procedures is
imperative on this product. Not following these procedures
could result in product failure which will not be covered
under manufactures warranty.
©
2014, Laurel Mountain
Picture 5
Figure 5
Picture 6
Copyright 2014 LMEZBPANSH | 072214