Installation Guide

What is your lead time? _____________
How long will the installation take once work begins? _____________
Will the crew stay on the job every day till the job is complete? ( ) no ( ) yes
Will there be a lead supervisor on the job at all times? ( ) no ( ) yes
Will you provide the appropriate permits required by the city? ( ) no ( ) yes
Do you have stamped engineering letter for your product lines? ( ) no ( ) yes
Do you provide detailed line drawing and specifications required for HOA
and permit approvals? ( ) no ( ) yes
Do you have design and construction expertise available in your organization to
help with custom units and special applications? ( ) no ( ) yes
Are you registered with the city? ( ) no ( ) yes
Do you offer financing through the Home Depot? ( ) no ( ) yes
Who do I call if I have a problem or warranty issue down the road? ______________
How much work will be done at the job site? ______________
Are the detail cuts performed in the shop on a duplicator machine? ( ) no ( ) yes
Will it be stained off site? ( ) no ( ) yes
Will you clean up and haul away all construction related debris? ( ) no ( ) yes
Does the structure include 5/8” all thread bolts? ( ) no ( ) yes
How is the structure anchored to the concrete? ___________
Cheaper isn’t always better! What you save today, you may spend double or triple to make it right tomorrow.
CONTRACTOR CHECKLIST (cont.)