Instruction Manual

Installation Instructions for
Tube 3
1.2
HS2933FR_1B35MRL
980MRLTUB3P
GP I :ENERAL RODUCT NFORMATION
This product is ETL listed and suitable only for indoor dry locations
and approved for use at any height above the finished floor.
This product is intended to be used with LBL Monorail system.
1
(H)
Connect the Fixture Arms
The overall fixture height (H) is measured from bottom of the
bottom glass shade to the end of the fixture Fusion Jack.
Determine the overall desired fixture height.The height (H1) is
from the bottom of the top shade to the end of the fixture
Fusion Jack and it is 39" inches when the fixture rods are
not cut.
GLASS SHADE
FIXTURE
FUSION
JACK
(H1)
Mark amount (LI) from one end of the fixture rod that needs
to be cut shorter. (Optional)
M3 SET
SCREW
1.6 MM
ALLEN
WRENCH
SOCKET PIN HOLE
Loosen the two M3 set screws on the(Do Not Remove)
socket assembly rods that are located on the opposite side of
socket pin holes.
(L)
FIXTURE ROD
NOTE: To avoid interference while relamping do not
cut the fixture rods (LI) more than 24" inches.
Cut the fixture arms with a sharp cutter. (Optional)
1A1A
1
2
3
4
1A1B
1A1C
3 2
4
4
Monorail

Summary of content (4 pages)