Users Manual

application, proceed with follow:
Multi-gang application
In multi-switch installations, the reduction of the switchs capacity may be
required. Refer to the chart for maximum load per switch.
Note: No derating is required for LED or CFL bulb applications.
Maximum Load Per Switch for Multi-gang
Load
Two-Gang
Three-Gang
incand
500W
500W
Product install introduction
1. Turn power off at the circuit breaker
2. Remove the existing switch and connect the new switch