User manual

Trimod®
Operating and Maintenance Manual
55
Capacity in Ah to enter is the one of a single string (1KB).
UPS calculates the total capacity of the battery as a product of KB * Total Capacity.
7. Exit the Service Mode by pressing the ON/OFF pushbutton.
8. Provide power to the UPS input and close the switch network UPS;
ATTENTION
When the unit detects the input voltage it automatically proposes starting a battery charging cycle. Press the ‘ESC
key to proceed to switching the UPS Trimod® ON.
9. Press the ON/OFF pushbutton the switch ON the UPS;
10. Wait until the status indicator on the display is solid green;
11. Verify that the values of voltage and frequency output set corresponds to the needs of the applied load. Otherwise
enter the required values .
12. Close the output switch of the UPS.
At this stage the load is powered and protected by the UPS Trimod®.
WARNING
If, when installing, you think it is necessary to check that the battery-run UPS is working properly, turn the mains
power voltage OFF by means of the switch breaker outside the UPS and NOT by means of the input breakers inside
the UPS distribution drawer.
If the UPS has internal batteries it will instead be necessary to open at least one drawer for each set (one set consists of 4
boxes). This cuts the power voltage off to the terminal block generated by the various sets of batteries. This must be done
for all sets.
Each drawer is fixed with two screws which must be removed beforehand.
Before programming the unit, make sure that all the
modules (inverter and/or battery drawers) are closed and
fixed with the screws.
Close the door and take the keys out.