User Manual

Table Of Contents
iCON gps 60, Setups with Controller and Accessories 79
Raw data logging
setup
step-by-step
a) iCON gps 60 antenna
b) Height hook
c) GRT146
d) Tribrach
e) Tripod
f) GEB171 external battery
g) GEV219 power cable
Step Description
1. Setting Up the Equipment
Set up the tripod, mount and level the tribrach onto the tripod.
Check that the tribrach is correctly centred over the marker.
Place and lock the carrier into the tribrach.
Screw iCON gps 60 antenna onto the carrier.
Check that the tribrach is still correctly positioned and levelled.
If available: Else:
Hang the external battery onto a
tripod leg.
Use internal batterie of the
antenna without battery cabling.
Take the GEV219.
Attach the connectors with the
8 pin plug to iCON gps 60
antenna.