Installation Manual

ProVision 3 Installation Manual
8100-35521-00
Rev. A1
Leidos Security Detection & Automation, Inc. Proprietary Page 2 of 119
© 2020 Leidos. All rights reserved
Contents
Disclaimer .................................................................................................................................................8
1.0 Introduction .....................................................................................................................................12
1.1 Relevant Procedures ....................................................................................................................12
1.2 Minimum Technical Qualifications .............................................................................................12
1.3 Contacting Customer Support .....................................................................................................12
2.0 Safety ...............................................................................................................................................14
2.1 Electrical Safety Precautions .......................................................................................................14
Line Voltages.......................................................................................................................14
Voltage and High Current ...................................................................................................14
2.2 Lockout/Tagout Requirements and Procedure ............................................................................15
2.3 Mechanical Safety Precautions ....................................................................................................15
Mast Antenna.......................................................................................................................15
Belt Drive ............................................................................................................................15
2.4 Toxic Safety Precautions .............................................................................................................16
2.5 Fire Safety Precaution .................................................................................................................16
2.6 Safety Features ............................................................................................................................16
3.0 Tools List .........................................................................................................................................17
3.1 Tools in Installation Kit ...............................................................................................................17
3.2 Additional Tools ..........................................................................................................................17
4.0 Crate Unpacking ..............................................................................................................................19
4.1 General Guidelines ......................................................................................................................19
Installation Kit Crate ...........................................................................................................19
Scanner Crate.......................................................................................................................19
4.2 Scanner Crate Unpacking ............................................................................................................21
4.3 Installation Kit Crate Unpacking .................................................................................................22
5.0 Genie Lift Assembly........................................................................................................................24
5.1 Genie Lift Components ...............................................................................................................24
5.2 Leg and Wheelie Bar Attachment ...............................................................................................25
5.3 Modified Cradle Fork Attachment ..............................................................................................27
6.0 Caster Operation ..............................................................................................................................28
7.0 Removal from Scanner Crate ..........................................................................................................31
8.0 Movement to the Install Location ....................................................................................................34
9.0 Upper Assembly Lift .......................................................................................................................36
9.1 Preparation of Assembly and Genie Lifts....................................................................................36
9.2 Upper Frame Assembly Lifting ...................................................................................................41
9.3 Genie Lift Removal .....................................................................................................................44
10.0 Scanner Leveling and Alignment ....................................................................................................45
10.1 Pre-leveling .................................................................................................................................45
10.2 Bolt-On Side Frames ...................................................................................................................45
10.3 Isolation Footpads (optional) .......................................................................................................47
10.4 Feet Lowered ...............................................................................................................................47
10.5 Seismic Bracket Kit (optional) ....................................................................................................47
10.6 Scanner Leveling .........................................................................................................................47
11.0 Scanner Assembly ...........................................................................................................................48
11.1 Upper Frame Torque ...................................................................................................................48
11.2 Bottom Outer Window Angle Brackets.......................................................................................48
11.3 Floor Cover Trim .........................................................................................................................49
11.4 Mounting Brackets ......................................................................................................................50