Installation Manual

ProVision 3 Installation Manual
8100-35521-00
Rev. A1
Leidos Security Detection & Automation, Inc. Proprietary Page 38 of 119
© 2020 Leidos. All rights reserved
column has the base plate on the left and the right column has it on the right, as shown in the
following figure.
Figure 29: Left and Right Columns
7. One left column should be installed at the left side of each end of the assembly, and one right column
should be installed at the right side of each end.
8. Rotate each column so that the bolt holes line up and the foot points away from the entrance or exit
(as shown in the following figure), then lift the column and fit it onto the cone-shaped pin.
9. Attach each column with four M16 x 30mm HC bolts (0201-10290-30) and four M16 flat washers
(0221-10051-00). Leave the bolts loose. You tighten them in the next section.
Figure 30: Orientation of Columns
10. Attach each of the four column head clamps using the hardware removed during step 0, as shown in
the following figure. Leave the clamps loose.