Installation Manual

ProVision 3 Installation Manual
8100-35521-00
Rev. A1
Leidos Security Detection & Automation, Inc. Proprietary Page 50 of 119
© 2020 Leidos. All rights reserved
11.4 Mounting Brackets
1. Determine the location of the operator control panel (OCP). The OCP can be located on the left
or right side of the electrical enclosure end of the scanner.
2. Install the first of three mounting brackets (3000-23601-00) onto the column at the location
selected in step 1.
3. Use the set of holes directly over the leveling foot (see following figure left and center), not the
other set that is around by the end of the scanner. The face of the bracket should point away from
the center of the scanner.
4. The mounting bracket is fastened using three M6 x 16mm FBHS screws (0201-10291-16) two
M6 fender washers (0221-10027-00) on the top and bottom holes as and one curved plate
(3000-23601-01) on the center hole as shown circled in red in the following figure right .
5. Leave the bracket loose enough so that it can be repositioned later, when the middle cover is
installed.
Figure 48: Mounting Bracket Installed on Column