2. If the OCP is being located on the left column at the electrical enclosure end, and the power input box
is being located in the upper position at the motor/pulley end of the scanner, you must separate the
cables.
3. Route the power input box/cable to its selected location and route the OCP, Ethernet and any other
cables to the OCP’s selected location.
Figure 69: Cabling Route with Power Input Box, OCP, and Other Cables Together
4. Cable-tie all cables. No cables should be allowed to drape off the side of the scanner, or drape into
the scanner. In addition, the cables should be tied in such a way as to prevent them from becoming
tangled with the moving parts on top of the scanner.
11.23 Top Down Power
Install an optional top down power per 8100-23121-TM option section or 8600-28515-IP.
11.24 Power Input Box
1. Install the power input box at the selected location, either at lower right of the electrical enclosure end
or at upper left of the motor/pulley end.
The power input box is fastened to the outer window bracket support, as shown in the following