14.0 Appendix A: ProVision 3 Control Kit Install Procedure
15.0 Purpose
This instruction explains how to install the Provision 3 Vibration Control Kit (1600-21348-00).
16.0 Scope
The Provision 3 Vibration Control Kit (1600-21348-00) is installed on units in the field that are
experiencing mast vibration/excitation due to dynamic, harmonic, periodic, transient or impulse loading
caused by machinery operating, moving, rotating or most likely human movement such as walking,
running or jumping.
This loading is seen in older facilities that have beam spans and floor girder construction that allow free
mode shape.
17.0 Applicable Documents
ProVision Lock out/Tag out Operating Procedure 8301-10708-00
ProVision 2 Installation Manual 8100-20556-00
18.0 Definitions
Radome Curved inner clear plastic panel
End-cap Sheet metal panel the holds the radome in place.
19.0 Requirements
Provision 3 Vibration Control Kit (1600-21348-00) includes the following components:
Part Number
Description
Qty
3000-22208-00
FOAM, MAST, ANTI-VIB, BLUE, PV2
5 (4 + 1 extra)
0540-22609-00
TAPE, 3M 4930, 1"W, 1.5YD RL
As required
19.1 Tools and Equipment
Tools required for dismantling Provision 3 to access or remove the inner radome/endcaps.
Scissors or razor knife
Tape measure
Fine tip marker
Alcohol
Template to locate foam (3000-22607-00)