Manual
7 Commissioning
Commissioning for 9300 series standard devices
EDKMF2102 DE/EN/FR 7.1
78
Inbetriebnahme93XX
Detailed
information
ProcedureStep
4.
Make other necessary controller settings.
Commissioning of the controller
Documentation
for the respective
controller
l For initial commissioning set code C0005 = 1011 (signal
configuration: speed control via AIF).
l Enable the controller.
– Terminal 28 (RFR: controller enable) is always active and has
to be HIGH during operation. Otherwise the controller will be
inhibited.
l Select the speed setpoint with C0141 in % of n
max
(value in
C0011).
Note
With the signal configuration C0005=xx11, terminal A1 is switched
as a voltage output. This means that only the following terminals
should be connected:
l X5.A1 to X5.28 (Controller enable)
l X5.A1 to X5.E1 (Clockwise rotation / QSP)