Instruction Manual

Wiring the device
Wiring
Terminal assignment
5
55
EDK94PNE245 DE/EN/FR/ES/IT 2.0
Mains
Terminal X111 Labelling Description
Fig.5−3
L1
L2
L3
Connection of the mains phases L1, L2, L3
C ti f th l id PE d t
Connection for the supply−side PE conductor
Terminal X112 Labelling Description
Fig.5−3
L1
L2
L3
Alternative connection at the bottom: mains phases L1, L2, L3
C ti f th l id PE d t
Connection for the supply−side PE conductor
Terminal data
Max. conductor cross−section Tightening torque
Screw drive
[mm
2
] [AWG] [Nm] [lb−in]
Device size 4:
Connection with ring
cable lug M8
50
(2 x 25)
1/0
8 71 SW13
Device size 5:
Connection with ring
cable lug M10
120
(2 x 50)
4/0
(2 x 1/0)
15 133 SW15
DC bus
Terminal X111 Labelling Description
Fig.5−3
+UG
−UG
Connection of DC−bus voltage
Cables routed upwards
Terminal X112 Labelling Description
Fig.5−3
+UG
−UG
Connection of DC−bus voltage
Cables routed downwards
Terminal data
Max. conductor cross−section Tightening torque
Screw drive
[mm
2
] [AWG] [Nm] [lb−in]
Device size 4:
Connection with ring
cable lug M8
70
(2 x 35)
2/0
8 71 SW13
Device size 5:
Connection with ring
cable lug M10
150
(2 x 70)
300 mcm
(2 x 2/0)
15 133 SW15