Manual

Commissioning and operation
Important notes
6
EN
25
Lenze ¯ MA 12.0014 ¯ 1.0
6 Commissioning and operation
6.1 Important notes
Stop!
The drive may only be commissioned by skilled personnel!
¯ Take safety measures prior to any operation:
Disconnect the machine from the mains, ensure standstill of the drive system
and avoid any machine movement.
6.2 Before switching on
Please check:
¯ Drive function - machine function assignment
¯ The direction of rotation of the drive shaft
g500−B 2−stage g500−B 3−stage
¯ Does the drive appear undamaged?
¯ Is the mechanical fixing o.k.?
¯ Is the electrical connection correct?
¯ Are all rotating parts and surfaces that may become hot protected against
contact?
¯ For gearboxes with breathing:
Has the transport locking device been removed?