Installation Guide

a.
e.
f.
g.
h.
b.
c.
d.
Figure 9
www.lesscare.com
ULTRA-D
TUB DOORS • SHOWER DOORS
INSTALLATION STEPS
14
8. Drill the holes on the wall using 8mm(5/16") drill bit and apply silicone into the holes, insert the Wall Anchors (12).
Mount the Wall Bracket of the Guide Rail Bracket (1) to the wall using the Screw M5×60 (13).
Please see Fig 9 for details
Note:
The other side of the Guide Rail bracket (1) is installed in the same way.
12
13
12
13