Installation Guide

www.lesscare.com
ULTRA-D
SHOWER ENCLOSURES
INSTALLATION STEPS
11
Figure 5
Figure 6
a.
a.
b.
b.
c.
d.
5. Drill the holes in the wall using Ø8mm(Ø5/16") drill bit and Apply silicone into the holes on the wall, insert the Wall
anchors (24) for the Clamps (23). Mount the Clamps to the wall using the Philip's screw M4*60(25).
Drill the hole in the shower base or threshold using Ø3mm (1/8”) drill bit and mount the Clamp (23) to the shower base or
threshold using the Philip's screw M4*30(26).
See Fig 5 for details
6 Place the Return Panel Glass (22) back to the designated position and assemble the Clamps (23) .
See Fig. 6 for details.
Outside
Outside Outside
Outside
Outside
Outside
25
25
24
24