Owner and manual
ONE PIECE TOILET
ADJUSTMENT & MAINTENACE (FILL VALVE)
body
clip
inlet pipe
Install the clip as per drawing
body
clip
inlet pipe
2.MAJOR WATER ADJUSTMENT
Note on Float Adjustment
float
shut-off cup
4.FILL VALVE INSTALLATION
rubber
washer
plastic
washer
nut
1. PREPARATION
3.MINOR WATER ADJUSTMENT
clip
screw
screw
rubber washer
(optional)
plastic washer
(optional)
nut
bottom of tank
cone washer
refill tube
plastic washer
wing nut
wing nut
water supply
pipe
adaptor
water supply pipe
www.lesscare.com
8
overflow
106mm
80mm
mm56
fill valve
flush valve
LT2T
Instructions:
When valve installed, the critical level mark
on fill valve (identified by C.L. mark on
valve body) shoud be at least 1" above top
of the over flow pipe.
Required:
• Water temperature: 36-112ºF
Important:
Under no circumstances LessCare shall not be liable for any and all
incidental damages sustained in connection with this product
Neither manufacture, nor distributor, nor retailer is responsible for
water damage or flood caused due to use of this product.
Under no circumstances LessCare shall not be liable for any and all
fees, cost of installation/reinstallation/removal, subsequent damage
or transportation in case of the product defect
Flush GPF amount and fill valve are factory set. No additional adjustment is required. This page is for reference only.
All adjustments are already made by manufacturer.
Important Note:
IMPORTANT: Do not use or drop any chlorine or any other chemicals. Use of chemical products will result in damage to the fill
valve and flush valve components and may cause flood and property damage. Do not overtighten bolts/nuts as it may and will
cause damage to the toilet parts and componets.
194-269mm
87-231mm
Refill tube (the refill tube is optional based
on the user's requirement.
Remove the worn-out fittings and clean your tank prior to the installation of the new ones. There might be a lot of impurities in your
tank that may cause damage to the new parts if you do not clean them out. The tank must be absolutely clean prior to installation.
Remove the clip as per the
drawing
Unscrew the nut and
remove both the plastic
and rubber washer
(optional)
Unscrew the fill valve
body counterclockwise,
push the bodyup or down
to the desired height and
refasten valve body by
turning clockwise.
Slide tab in the "Open" direction
as shown in the drawing
To reduce water level:
Lower the float to the
desired height and rotate
the thumb screw counter-
clockwise. This will -
move the float -
down as per drawing
To increase water level:
Rotate the thumb screw
clockwise.Lift the float
and the water level will
correspond.Set the float
to the desirable position.
(as the drawing)
Slide the tab to the "CLOSE"position
as per the drawing.
0.5-2mm
0.5-2mm
Make sure that distance between
float and shut-off cup is 0.5-2mm
while at adjustment
Install water supply line onto the shank of the
fill valve and turn on water supply valve/angle
stop.Choose adaptor or wing nut based on
actual requirement.
Inser the fill valve i
nto the installation
hole at the bottom of the tank and then
install the rubber and plastic washer
(optional) and tighten the nut.
Insert the refill tube into the
overflow pipe(optional) of the
flush valve.