Installation Manual

Series
Series 1000 and Series 2000 Installation Manual
Leviton Manufacturing Co., Inc. 16
Figure 6: Leviton split core CTs
Installing Split Core CTs
1. Route CT secondary wires through conduit if not already done.
2. Trim the wire to the appropriate length to avoid coils of excess wiring.
3. Strip wiring to approximately .300 inches.
4. Connect the CT leads to the appropriate meter as described above.
5. With power to the conductors turned off, place one CT around each conductor,
ensuring that the white dot is facing the line side.
Failure to install CTs in the correct orientation and on the correct phase will lead to inaccurate meter
readings.